Every small manufacturer that decides to try kaizen faces the same fork within a month: run a concentrated improvement event, or stand up a daily suggestion routine. Vendors sell the first because it invoices cleanly. The Japanese record was built mostly on the second. The two are not rivals so much as different machines — one is a milling operation, the other is corrosion protection — but they compete for the same scarce resources in a small shop: supervisor hours and crew trust. This comparison puts the two side by side on cadence, roles, cost, and documented results, then gives the sequencing question a straight answer. The working question underneath it: which of the two failure modes — post-event decay or response silence — is your shop structurally more likely to commit?

KEY POINTS

The comparison, attribute by attribute

Attribute Kaizen eventA 2–7 day concentrated improvement burst on one bounded problem Daily teian systemA standing suggestion routine with a fixed response deadline
Method documented in a public primary source[1]EPA three-phase training module[2][5]Toyota's own program records; TPS reference documentation
Quantified results on the public record[4]50–70% changeover cuts, 30–70% lead-time cuts reported for 3–5 day events[2]volume and adoption rates documented at Toyota scale; small-shop dollar results are rarely published — keep your own count
Sustains without a monthly management routine[3]fieldwork across 65 events: follow-up mechanisms predict whether gains survive[7]participation dies when responses lag; the routine is the product
CadenceEpisodic — a shop might run two to four a year; planning can take longer than the event itself[1]Continuous — suggestions arrive weekly, answers due within 72 hours (our recommended rule), review monthly
Who does whatSponsor picks the target and attends report-out; facilitator (internal or hired) runs the week; 5–8 person team executes; an auditor re-measures at day 30Every worker submits; one supervisor reads and answers; management reviews the implemented count monthly; no facilitator role exists
Cash and wage cost (estimate)$0–$12,500 facilitation[6] plus roughly $3,600–$9,700 in team wages per event at the $30.19 BLS average — arithmetic in D-KAI-06Under $1,000 cash to start (estimate); 2–3 supervisor hours weekly, indefinitely — the cheapest bucket in dollars, the most expensive in discipline
Best first targetOne bounded, expensive problem: a two-hour changeover, a rework loop, a bottleneck cellOperator irritations: missing tools, unclear travelers, small hazards — the problems workers know best[7]
Characteristic failureThe event series: applause, drift, repeat — gains decay without institutionalized review[3]The silent box: suggestions age unanswered and the crew correctly concludes nobody is listening
See details5-Day Kaizen Event Checklist (D-KAI-03)The teian routine and its 4 supporting habits (D-KAI-01)

How to read the symbols: = documented in a primary source · = partial or conditional · = weak — verify before relying on it · = not applicable. Every symbol translates a sourced fact or a labeled estimate; bracketed numbers point to the reference list.

Month 1 Month 6 Month 12 event 1 event 2 event 3 decay without follow-up teian: implemented suggestions, cumulative event gains (burst) post-event decay path if unaudited daily routine
Figure 1: The two cadences over one year, drawn schematically (not to data). The decay paths after each event spike illustrate the documented sustainability finding; the slow-rising line illustrates the suggestion-volume pattern in Toyota's published program history.Sources: References 2, 3 (schematic illustration by the Gemba Works editorial team).

What the results columns actually say

Read the two "results" rows carefully, because they are not symmetrical kinds of evidence. Event results are point measurements: an MEP-network affiliate reports that 3–5 day events typically cut changeover times 50–70% and lead times 30–70%[4]. Those numbers are real and fast, and they are also exactly the numbers the sustainability fieldwork warns about: across 65 events in eight manufacturers, what predicted whether gains still existed months later was not the event-week result but the post-event mechanisms — management review, institutionalized follow-up[3]. The EPA module writes a whole third phase around the same point, with monthly meetings after the event week[1].

Teian results are trajectory measurements. Toyota's official program history shows the shape: 789 suggestions in the first year, roughly 20,000 by 1967, 168,000 in 1972 against a 120,000 target, 220,000 through early October 1973 from a workforce of about 43,000 — with the adoption rate climbing from 29% in 1956 to 76% in 1972[2]. Two decades of compounding, and the striking variable is not idea quality but the adoption rate: the system got better at saying yes. A documented single suggestion from 1972 — automatic piston-ring setting equipment — saved about ¥24 million (roughly $91,000) a year[2], but the design lesson for a 30-person shop is the ratio, not the jackpot: mature systems approve most of what comes in, quickly, and count what they implement[5].

Roles: the org-chart difference nobody prices in

An event needs a cast: a sponsor who owns the target, a facilitator who runs the week (hired at published rates of $1,500–$3,000 a day if not internal[6]), a 5–8 person team pulled off their jobs, and an auditor with a calendar date. Teian needs exactly one named role beyond the workforce itself: the supervisor who reads and answers, inside the deadline, every week including bad ones. This is why events feel easier to buy and teian feels easier to afford — and why each fails where it does. An event's cast disperses when the week ends, which is the decay mechanism[3]; teian's single role is invisible on any invoice, so it is the first thing sacrificed to a rush order, which is the silence mechanism. OSHA's worker-participation guidance describes the underlying law of both: people keep contributing to systems that visibly act on what they raise, and stop when the system goes quiet[7].

The sequencing answer

Start teian first — four weeks before any event. The reasons are practical, not philosophical. First, the suggestion flow generates the event target list: after a month you know which changeover, which cell, which recurring irritation deserves a concentrated week, instead of letting a facilitator's intake questionnaire guess. Second, teian establishes the response habit that event follow-up will depend on — a shop that cannot answer a suggestion in 72 hours will not hold a 30-day audit date either. Third, the costs stack sensibly: teian's sub-$1,000 start (estimate) risks almost nothing while the crew decides whether this attempt is real — a live question if a previous program died (D-KAI-05).

Then run events as punctuation, not as the program. Two to four a year is plenty for a shop under 200 people, each with its follow-up phase scheduled before the event is[1], each feeding its results back into standard work so the gain outlives the team — the capture step our video SOP method (D-SKT-04) makes cheap. The full calendar that interleaves both cadences — teian from week 3, first event in month two, monthly reviews from month three — is the 90-day plan in the pillar guide (D-KAI-P01), with the budget arithmetic at small scale in D-KAI-06 and the job-shop target translation in D-KAI-07.

The honest summary: events buy speed and proof; teian buys permanence and participation. A shop that runs only events rents its improvements. A shop that runs only teian improves slowly and may never crack its biggest bottleneck. The record — from the EPA's phase model to Toyota's twenty-year suggestion curve — belongs to shops that run the drumbeat and add the bursts[1][2].

next step

Running the event side first? The printable checklist covers preparation, all five days, and the 30-day follow-up that the sustainability research keeps pointing at.

Open the 5-Day Kaizen Event Checklist (D-KAI-03) Related: the teian routine explained (D-KAI-01) · 10 kaizen patterns (D-KAI-02) · the complete implementation guide (D-KAI-P01) · kaizen board templates (D-KAI-10) · full section index
We do not publish invented comparisons. Every figure in the table above links to a primary source or is labeled as an estimate; the timeline figure is marked as schematic. Our methods: how this site is made.

references

  1. U.S. EPA — Lean and Environment Training Module 4: Kaizen Events (three-phase model; 2–7 day events; monthly follow-up meetings; planning can exceed event duration)
  2. Toyota Motor Corporation (official release, Oct. 1973) — suggestion program history: 789 ideas (1951), 220,000 suggestions (1973) from ~43,000 employees, more than 70% adopted; adoption rate 29% (1956) to 76% (1972); documented ¥24M/year single-suggestion saving
  3. Glover, W.J., Farris, J.A., Van Aken, E.M., Doolen, T.L. (2011). "Critical success factors for the sustainability of Kaizen event human resource outcomes: An empirical study." International Journal of Production Economics, 132(2), 197–213. Abstract
  4. MANTEC (MEP National Network affiliate, Pennsylvania) — Kaizen Events for Manufacturers (reported 50–70% changeover and 30–70% lead-time reductions from 3–5 day events)
  5. Art of Lean — Toyota Creative Idea Suggestion System (TPS Encyclopedia reference on system mechanics and adoption discipline)
  6. 6sigma.us — Lean Kaizen Event Facilitation (published pricing: $3,000/1 day, $8,000/3 days, $12,500/5 days). Vendor example, cited as a price reference only
  7. OSHA — Safety Management: Worker Participation

Last updated: 2026-07-18 | Primary sources referenced: 7 | Every unlabeled figure links to a source; estimates and schematic figures are marked as such. Spotted an error? Tell us via the contact page.

← となりナビ トップへ